Pier Tube Die Description:
Versatile Tungsten Steel Tube End Dies:Our tungsten steel tube end forming dies are built for precision and longevity. They can be customized for expansion, shrinking, and pier applications on copper, aluminum, stainless steel, and iron pipes. With superior hardness and wear resistance, these dies ensure extended service life, making them ideal for industries like air conditioning, automotive, aerospace, and water heaters. Compatible with tube end forming machines from OMS, JDM, and others, they offer reliable performance and customizable specifications.
Pier Tube Die Specifications:
Φ3,Φ4,Φ4,76,Φ5,Φ6,Φ6.35,Φ7,Φ7.94,Φ9.53,Φ8.9,Φ12,Φ12.7,Φ14.5,Φ15.88
Pier Tube Die Show:
Application Industry:
Manufacturing Workshop:
Guangzhou Runshi Mold Co., Ltd. focuses on the precision machinery manufacturing industry. Since its establishment, the company has mainly provided equipment molds, vulnerable parts, and cutting tools for air conditioning and heat exchanger manufacturing enterprises. It also provides ceramic parts and tungsten steel parts for industries such as new energy, fluid control, medical devices, semiconductor, aerospace, photovoltaics, lithium batteries, petrochemicals, high-precision automation equipment, electronic communication, automobiles and so on.
FAQ
Q:What is the name of this product?
A: pier tube Die Tube End Forming Die Expansion Tool Flaring Tool Expanding Tool Flare Tool Expansion Die Flaring Die shrinking Tool Shrinking Die Shrinkage Tool Pier Tube Die Pier Tube Tool.
Q: Are you trading company or manufacturer ?
A: We are manufacturer.
Q: What industry is the pier tube Die mainly used for?
A: It is an important end forming parts for CNC Tube End Forming Machine,End forming machine with spinning mode,End forming machine with flinging mode,CNC Tube Integrated Machine(All In One),CNC Tube Integrated end forming Machine,tube pier head machine.
Q: How to manufacture after the order is confirmed?
A: We need to provide samples or drawings, one of which is sufficient. Our production engineers are professionals with over 10 years of experience, and they know how to control tolerances and precision.
Q: How long is your delivery time?
A: Generally it is 5-10 working days if the goods are in stock. or it is 15-20 working days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>10000USD, 50% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us