Integrated Machine Clamping Die Description:
SKD11 Steel CNC Cutting and Tube Bender Integrated Machine Die for Accurate Bending:This CNC tube bending die, crafted from high-quality SKD11 die steel, provides the perfect hardness for efficient bending of copper and aluminum pipes. With its precise bending groove and mirror-polished surface, it ensures that every bend is smooth, bright, and free from imperfections. It is designed for use with CNC 3D Cutting and tube bender integrated machine from OMS and JDM, especially in industries such as air conditioning and water heaters.
Integrated Machine Clamping Die Specifications:
Φ5,Φ6.0,Φ6.35,Φ7,Φ7.94,Φ9.53,Φ12,Φ12.7,Φ14.5,Φ15.88,Φ19.05,Φ22.22,Φ28
Integrated Machine Clamping Die Show:
Application Industry:
Manufacturing Workshop:
Guangzhou Runshi Mold Co., Ltd. focuses on the precision machinery manufacturing industry. Since its establishment, the company has mainly provided equipment molds, vulnerable parts, and cutting tools for air conditioning and heat exchanger manufacturing enterprises. It also provides ceramic parts and tungsten steel parts for industries such as new energy, fluid control, medical devices, semiconductor, aerospace, photovoltaics, lithium batteries, petrochemicals, high-precision automation equipment, electronic communication, automobiles and so on.
FAQ
Q:What is the name of this product?
A: CNC Tube Bending Machine Bending Die Return Bender Die POM Clamping Die Guided Die R-Tool Bender Die
Q: Are you trading company or manufacturer ?
A: We are manufacturer.
Q: What industry is the CNC Tube Bender POM Clamping Die mainly used for?
A: It is an important bending tube parts for CNC 3D tube bending machine and copper tube hairpin bender or return bender
Q: How to manufacture after the order is confirmed?
A: We need to provide samples or drawings, one of which is sufficient. Our production engineers are professionals with over 10 years of experience, and they know how to control tolerances and precision.
Q: How long is your delivery time?
A: Generally it is 5-10 working days if the goods are in stock. or it is 10-25 working days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>10000USD, 50% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us