Precision Alloy Mandrel for Bending Steel Tube Elbow with Customizd
Alloy Mandrel Description:
Premium Alloy Mandrel for Stainless Steel & Iron Tubes:This alloy mandrel is constructed from high-quality SUJ2 bearing steel and hard alloy materials, with a ball head made from a super-hard, wear-resistant alloy for enhanced strength and longevity. Compatible with CNC tube bending machines, it is perfect for bending stainless steel and iron pipes with precision. Widely used in the manufacturing of stainless steel heat exchangers, surface coolers, and automotive tube fittings, this mandrel ensures durability and high performance. It can bend pipes with outer diameters of Φ9.52, Φ12, Φ12.7, Φ15.88, Φ16, and Φ19.05, with customizable specifications.
Alloy Mandrel Specifications:
Φ4.14,Φ6.0,Φ6.22,Φ6.85,Φ8.55,Φ8.8,Φ9.6,Φ10.6,Φ12.9,Φ14.1,Φ15.5,Φ16.5,Φ18.3
Alloy Mandrel Show:
Application Industry:
Manufacturing Workshop:
Guangzhou Runshi Mold Co., Ltd. focuses on the precision machinery manufacturing industry. Since its establishment, the company has mainly provided equipment molds, vulnerable parts, and cutting tools for air conditioning and heat exchanger manufacturing enterprises. It also provides ceramic parts and tungsten steel parts for industries such as new energy, fluid control, medical devices, semiconductor, aerospace, photovoltaics, lithium batteries, petrochemicals, high-precision automation equipment, electronic communication, automobiles and so on.
FAQ
Q:What is the name of this product?
A:Bending Mandrel One-Way Mandrel Dull Mandrel Alloy Mandrel Aluminum tube mandrel
Q: Are you trading company or manufacturer ?
A: We are manufacturer.
Q: What industry is the Alloy Mandrel mainly used for?
A: It is an important bending tube parts for CNC 3D tube bending machine and copper tube hairpin bender or return bender
Q: How to manufacture after the order is confirmed?
A: We need to provide samples or drawings, one of which is sufficient. Our production engineers are professionals with over 10 years of experience, and they know how to control tolerances and precision.
Q: How long is your delivery time?
A: Generally it is 5-10 working days if the goods are in stock. or it is 10-25 working days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=10000USD, 100% in advance. Payment>10000USD, 50% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us