HSS ASP30 Upper Cut Off Blade 3/8 In Fin Die For Cutting Aluminum Foil
Product Specifications
Attribute |
Value |
Product Name |
Fin Die Cut Off Blade Fin Die Accessories Fin Die Spare Parts |
Material |
HAP40 or ASP30 |
Specification |
1/4",3/8",1/2",5/8",3/4",7/8",1" etc |
Processing |
Precision CNC Lathe Turning |
Heat Treatment |
HRC 64°-66° |
Accuracy |
0.001 |
Quality |
100% Inspection |
Surface Finish |
Ra 0.4 |
Surface Treatment |
Burnishing |
Service |
OEM or ODM |
Application |
High speed fin press line for punching aluminum foil, copper foil, stainless steel, etc |
Product Description
Our fin die cut off blades, constructed from advanced powder HSS HAP40 or ASP30, guarantee exceptional service life and precision. These blades effectively punch aluminum foil, copper foil, and stainless steel, making them vital for fin production in air conditioning and refrigeration, heat exchangers, surface coolers, evaporators, and condensers.
We offer customized spare parts for various brands of high-speed fin dies, including a wide array of punches, dies, slitting blades, and complete fin die accessories.
Available Specifications
5mm, 1/4", 7mm, 5/16", 8.9mm, 3/8", 12.7mm, 1/2", 14.5mm, 5/8", customized sizes available
Product Images
Application Industry
Manufacturing Information
Guangzhou Runshi Mold Co., Ltd. specializes in precision machinery manufacturing, providing equipment molds, vulnerable parts, and cutting tools for air conditioning and heat exchanger manufacturing. We also serve industries including new energy, fluid control, medical devices, semiconductor, aerospace, photovoltaics, lithium batteries, petrochemicals, and high-precision automation equipment.
Frequently Asked Questions
What is the name of this product?
Fin die Cut Off Blade, Fin Die Accessories, Fin die spare parts
Are you a trading company or manufacturer?
We are manufacturer.
What industry is the fin die Cut Off Blade mainly used for?
It is an important die accessories for the production of fins in the air conditioning and refrigeration industry, heat exchangers, surface cooler, evaporators, and condensers.
How to manufacture after the order is confirmed?
We need samples or drawings. Our production engineers with over 10 years of experience know how to control tolerances and precision.
How long is your delivery time?
5-10 working days for in-stock items, 15-25 working days for custom orders, depending on quantity.
What are your payment terms?
Payment ≤ $10,000 USD: 100% in advance. Payment > $10,000 USD: 50% T/T in advance, balance before shipment.
For additional questions, please feel free to contact us.